Homepage | Set Home | Add to Favorites
Member

Tianjin Giant CDH Hengyuan Trade Co. Ltd


Products
  • No Category
Search
 

Friends links
  • No link

Spiral Welded Steel Pipes
Click image to view full size image
Product: Views:180Spiral Welded Steel Pipes 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-08-27 11:45
  Inquiry
Details
Model Number: Welded Steel Pipes Brand Name: HYJH Key Specifications/Special Features: Standard: EN10219, EN10210, ASTMA500, GB/T3094-2000, GB/T6728-2002, GB/T 178-2005, JIS G 3466Materials: Q235A, Q235B, Q345, L245, L290, X42, X52, X60, X70, X80, 0Cr13, 1Cr17, 00Cr19Ni11, 1Cr18Ni9, 0Cr18Ni11NbOD: 200-1800mmWall thickness: 2-20mmLength: 3-12m or customized
  • Application: public waterworks, petrochemical industry, chemical industry, electric power industry, agricultural irrigation, urban construction and more
  • Product: welded steel pipes
    Size OD 1/8”-48” (10.3mm-1219mm)
    Wall Thickness 0.5mm-19.03mm
    SCH30, SCH40, STD, XS, SCH80, SCH160, XXS and more.
    Length Less than 12m
    Steel material Q195 → Grade B, SS330, SPHC, S185
    Q215 → Grade C, CS type B,SS330, SPHC
    Q235 → Grade D, SS400, S235JR, S235JO, S235J2
    Q345 → SS500, ST52
    Standard BS EN10296, BS EN10025, BS EN10297, BS6323, BSEN10219, BSEN10217, GB/T13793-1992, GB/T14291-2006 GB/T3091-1993, GB/T3092-1993, GB3640-88
    Use Used for irrigation, structure, accessorize and construction
    Ends 1) Plain
    2) Beveled
    3) Thread with coupling or cap
    End protector 1) Plastic pipe cap
    2) Iron protector
    Surface Treatment 1) Bared
    2) Black painted (varnish coating)
    3) Galvanized
    4) With oiled
    5) 3 PE, FBE, corrosion resistant coating
    Technique Electronic resistance welded (ERW )
    Electronic fusion welded (EFW)
    Double submerged arc welded (DSAW)
    Type welded steel pipes
    Welded line type Longitudinal, spiral
    Section shape Round
    Inspection Third party is welcome
    Package 1) Bundle
    2) In Bulk
    3) Bags
    4) Clients' requirements
    Delivery 1) Container
    2) Bulk carrier
    Port of Shipment Xingang Port,Tianjin, China
    Date of delivery 30 days after receive your deposit or original LC
    Payment L/C, T/T
    Shipping Information:
    • FOB Port: Tianjin
    • Lead Time: 15 - 30 days
    Main Export Markets:
    • Asia
    • Australasia
    • Central/South America
    • Eastern Europe
    • Mid East/Africa
    Inquiry